Massaro served as the general contractor for the U.S. Steel Community Field at Hazelwood Green, performing full site preparation, utility work, and the installation of a full-size, multi-sport synthetic turf field equipped with sports lighting, spectator amenities, and connected riverfront park pathways.
Massaro served as the general contractor/construction manager, delivering a state-of-the-art community athletic and recreation facility on the historic former steel mill site. The scope encompassed comprehensive site preparation and development—including grading, utility installation, and stormwater management infrastructure—followed by the installation of a full-size, multi-sport synthetic turf field equipped with sports lighting, perimeter fencing, spectator amenities, and accessible pathways connecting the field to the surrounding Hazelwood Green riverfront park network.